Ah, yes, time consuming! My approach is from inside, removing the wall linings.
So I have begun...did some minor sealing as there was a tiny gap between top bevel back board and surfeit.
Then put air celled pvc thing( was a land agent's sign) on the bottom plate, between the studs: I figured if any moisture ever got there it won't directly touch the base of the insulation.
Now I have put the first expol panel in...